Construction work for 1 tool construction line 154km through 154kV

Project Name Construction work for 1 tool construction line 154km through 154kV
Project Period Jun.2010 ~ Mar.2014
Location Based on the assumption of 5,154 kV electric power plants, new 154kV power transmission lines are not available.
Client Korean electric power corporation
Project Overview - Track length : 28.114 km (2 circuit)

- Water supply : 84 pylon (2 lines, C-steel steel pylon)