Plant
Construction work for 1 tool construction line 154km through 154kV
Project Name | Construction work for 1 tool construction line 154km through 154kV |
---|---|
Project Period | Jun.2010 ~ Mar.2014 |
Location | Based on the assumption of 5,154 kV electric power plants, new 154kV power transmission lines are not available. |
Client | Korean electric power corporation |
Project Overview | - Track length : 28.114 km (2 circuit)
- Water supply : 84 pylon (2 lines, C-steel steel pylon) |